Confirm the inspection stages at the start
Ask the building control body which stages it wants to inspect, how much notice it needs and who should book each visit. Foundation excavations, drainage, structural work and insulation are examples of stages to discuss. The programme will depend on the project and the inspection requirements you are given.
Keep information together on site
Give the builder the latest drawings, relevant structural details and the inspection schedule. If a site issue means the work needs to change, record the proposal and agree who should review it before it is covered. Ask the inspector what evidence they will accept where a detail will become inaccessible.
Prepare for completion while the work is underway
Ask early which certificates or records will be needed at the end and who will provide each one. Keep inspection notes and supporting documents together, then arrange the final inspection and follow up on any outstanding items the building control body identifies.
Where the technical drawings help
Clear plans and sections help the team identify what should be built and where it needs checking. If your builder has raised questions about a junction, structure or drainage layout, send Bright the current drawings and explain the site issue so we can scope the design input.
GOV.UK building control application and completion guidance
Related article Full plans or building notice for a home extension?
