Full plans or building notice for a home extension?

Compare two building control application routes in England and find out what to ask before preparing your extension drawings.

Brick rear extension in Cambourne

How full plans works

A full plans application gives the building control body plans and supporting information to assess before construction. For an extension with structural changes or several complicated junctions, the review can help surface drawing queries while the team still has time to resolve them.

How a building notice works

A building notice is available for some smaller projects. GOV.UK explains that this route does not give the formal approval provided by the full plans route. Check eligibility with the building control body before choosing it, and agree what technical information it may ask for during the work.

What to resolve with the design team

Think about the decisions your builder needs to price. A wide opening in the back wall, a change in floor level or a drainage diversion can affect the work substantially. Agree which drawings and calculations each consultant will prepare and what the building control body expects to see.

Ask Bright to scope the technical package

If you already have planning drawings, send them with the decision notice and a list of changes. Tell us whether a builder or structural engineer is appointed so we can discuss the drawing scope and coordination before you commit to a route.

GOV.UK guidance on applying for Building Regulations approval

Related article What happens at building control inspections for an extension?

Explore Guides & Advice

What could your home become?

Tell us what you’d like to change. We’ll help you work out the next step.

Discuss your project